Construction Projects using
Autolaunch software |
|
|
Aluminium
 |
Aluminium Curtain Walling at the
Ashford Fire Station for Kent County Council
The Autolaunch Lineal Optimiser
was quite happy to process the raked and angled components abutting
the roof using ID tagging to show the angle of the top cut. |
|
Aluminium
 |
Aluminium Curtain Walling
processed with the Autolaunch Lineal Optimiser.
Raked head window inserts also
used the software. |
|
|
Steel
 |
Over a thousand tonnes of steel
were used as prop supports for the cut and cover tunnels in the
Channel Tunnel Rail Link through Ashford. Autolaunch Optimisers
played an important part in assessing raw material requirements for
this contract.
|
|
|
Steel
 |
One of hundreds of old style
Vehicle Matrix Signs produced, taking advantage of Autolaunch Optimisers.
 |
|
|
Steel
 |
One of two link bridges from the London Eye to a
floating pontoon on the River Thames.
|
|
|
Steel
 |
One of 25 portal gantries on the approach to the M6
Toll Road using Autolaunch Optimisers.
|
|
|
Steel
 |
Long shot of the Baggage Handling link bridge at the
North Terminal of Gatwick Airport. It's 120 Metres from end to end,
with a width span of 7.5 metres. Inside is a complicated array of
luggage conveyors. The Autolaunch Optimisers played their part in
assessing both plate and lineal steel components for this contract.
|
 |
Exterior close up with an internal view of the baggage
link bridge during fit-out. |